
P R O J E C T S

SEWAGE MAINTENANCE BUILDING
NORTH DAVIS, UTAH 8/24/2018
40,000 foot tenant finish, began at the start of September and was finished the end of 2018.
USPS SUPPLY CHAIN SOLUTIONS
SALT LAKE CITY, UT 9/28/2018
4500 square foot office renovation.
$600,000


PUBLIC WORKS COMPLEX
WASHINGTON TERRACE, UT 6/30/2018
New public works complex including 24,000 square foot office & maintenance building, 12,000 square foot vehicle storage building and salt storage structure.
$4,200,000
FIRE LOGISTICS BUILDING
SALT LAKE CITY, UT 10/1/2017
New 19,000 square foot support building. The project includes; all site work, concrete, interior finishes, mechanical, and electrical.
$1,800,000


NORTH SHORE CORPORATE CENTER
AMERICAN FORK, UT 5/31/2017
Two new office / warehouse buildings of approximately 24,000 square feet each, on approximately 3.5 acres. The project includes; underground utilities, excavation, asphalt, landscape, concrete, masonry, steel structure, joist & deck, interior finishes, mechanical & electrical.
$4,000,000
BELTWAY OFFICE / WAREHOUSE COMPLEX
WEST JORDAN, UT 8/1/2017
Two 10,000 square foot office/warehouse buildings. The project includes; all site work, concrete, masonry, structural steel, joist & deck, roofing, overhead doors storefront, some interior finishes, mechanical, and electrical.
$2,000,000


UDOT MAINTENACE COMPLEX
MORGAN, UT 5/1/2017
New 14,000 square foot maintenance facility. The project includes; site utilities, asphalt paving, concrete, masonry, structural steel, roofing, overhead doors, all interior finishes, fire sprinklers, mechanical and electrical.
$3,500,000
UPS DISTRIBUTION FACILITY
UT 8/19/2016
New 22,000 square foot addition to an existing warehouse facility.
$2,000,000


PUBLIC WORKS ADDITION
SPANISH FORK, UT 5/31/2016
New building addition to existing Spanish Fork Public Works facility. The project includes; metal building, interior finishes, and site work.
$1,200,000
UTA FUEL & FARE BUILDING
SALT LAKE CITY, UT 9/15/2015
11,000 square foot CMU building using 12" insulated block. The project also included 2 acres of concrete paving, steel structure, CNG fueling equipment, vehicle service equipment, and an emergency generator system.
$6,156,000


VANGUARD ACADEMY
WEST VALLEY, UT 8/31/2015
42,000 square foot interior tenant finish for a 7th through a 12th-grade charter school. The project included complete interior demolition and all interior finishes, mechanical and electrical.
$1,200,000
UDOT KAMAS MAINTENANCE FACILITY
KAMAS, UT 8/15/2015
New salt storage building, wash & sander racks, site utilities, site concrete.
$1,250,000


HANGARS AT SKYPARK AIRPORT
NORTH SALT LAKE, UT 6/1/2015
15,000 square foot pre-engineered metal building aircraft hangar, subdivided into 5 individual plane storage units. The project includes; storm drains, water lines, asphalt, concrete, building, and electrical.
$500,000
MAGNA WWTP ADMINISTRATION BUILDING
MAGNA, UT 8/1/2013
3,500 square foot wood frame structure with rock and stucco exterior housing Water District offices. The project also includes asphalt parking, site work, and landscaping.
$774,000


BLACKRIDGE RESERVOIR PARK
HERRIMAN, UT 5/1/2013
10-acre city park incorporating a secondary water storage reservoir into a recreational park with restrooms, concession building, playground, and landscaping.
$1,000,000
SORENSON UNITY CENTER
SALT LAKE CITY, UT 12/1/2007
This is a 36,000 square foot LEED platinum certified, a multi-purpose facility serving residents of Salt Lake County. This masonry and steel frame structure includes athletic, training, and exercise facilities, drop-in child care, donated dental services, training, and educational classrooms, offices, art and gallery spaces
$4,694,996


DAVIS COUNTY DMV BUILDING
FARMINGTON, UT 6/30/2007
This 5,300 Square Foot Building is built with Metal Framing and Decking. It also features ICF walls.
$1,423,000
GRANTSVILLE FIRE STATION
GRANTSVILLE, UT 3/20/2007
New 15,000 SF Fire Station. CMU, Steel Framed with substantial site work and a Bell Tower.
$2,255,000


DRAPER OFFICE/WAREHOUSE BUILDINGS
DRAPER, UT 4/1/2007
Four 14,400 SF CMU Buildings with Site work
$2,640,000
STAPLES #1408
ROCK SPRINGS, WY 10/28/2006
28,000 square foot tenant interior finish in an existing shopping mall.
$569,000


FIRST NATIONAL BANK, DRAPER BRANCH
DRAPER, UT 6/1/2005
This Three Story Building is approximately 6,000 SF with finished office space. Interior woodwork throughout. Granite at tellar lines with solid surface work area. Natural Stone Tile and exterior. Wood Framing, EIFS, and Standing Seam Metal Roof.
$1,265,000
CHANNING HALL ACADEMY
DRAPER, UT 9/30/2006
A Charter School in Draper, Utah. 43,494 Square Feet Wood Framed Structure. Masonry wall Auditorium. Site work includes a Soccer Field and Playground.
$3,800,000


SPRING LAKE HOUSING DEVELOPMENT
SPRING LAKE, UT 4/1/2004
Immigrant Housing development. Multi-Family for Utah County Housing Authority.
$2,200,000
OSSINE' SHOES
WEST JORDAN, UT 10/1/2003
4,000 square foot masonry retail building with all interior finishes and minor site work.
$767,000


WESTERN GARDEN CENTER
WEST VALLEY CITY, UT 9/1/2001
New greenhouse and retail center with associated site development.
$1,575,000
WEST JORDAN SENIOR CENTER
WEST JORDAN, UT 8/31/2001
Project Manager Walter Newman and Superintendent Joe Everill Have completed West Jordan Senior Center The project was finished ahead of schedule. The Senior Center has been a successful project for Brubaker Construction Inc. and all parties involved. Our appreciation to Jensen Haslem, the architects that designed the building.
$2,235,000


BIG COTTONWOOD SWIMMING POOL
HOLLADAY, UT 1/1/2001
With a radius wall that sheaths the façade of the indoor pool and tight window lines wrapping around the perimeter of the building, this structure is fantastically aesthetic. The state-of-the-art pool was designed to minimize the risk of infants wandering from busy parents, as there is no direct drop-off on the shallow end. With six curved water slides, weight, and training rooms, along with one of a kind baseball diamond, this facility is a fantastic addition to the already special Brubaker Portfolio.
$4,864,000