top of page

P R O J E C T S

IMG_7723.JPG

SEWAGE MAINTENANCE BUILDING

NORTH DAVIS, UTAH 8/24/2018

40,000 foot tenant finish, began at the start of September and was finished the end of 2018.

USPS SUPPLY CHAIN SOLUTIONS

SALT LAKE CITY, UT 9/28/2018

4500 square foot office renovation.

$600,000

new-ups-logo-vector-download_edited.png
DJI_0015_Moment.jpg

PUBLIC WORKS COMPLEX

WASHINGTON TERRACE, UT 6/30/2018

New public works complex including 24,000 square foot office & maintenance building, 12,000 square foot vehicle storage building and salt storage structure.

$4,200,000

FIRE LOGISTICS BUILDING

SALT LAKE CITY, UT 10/1/2017

New 19,000 square foot support building. The project includes; all site work, concrete, interior finishes, mechanical, and electrical.

$1,800,000

IMG_9556.jpg
IMG_0056.JPG

NORTH SHORE CORPORATE CENTER

AMERICAN FORK, UT 5/31/2017

Two new office / warehouse buildings of approximately 24,000 square feet each, on approximately 3.5 acres. The project includes; underground utilities, excavation, asphalt, landscape, concrete, masonry, steel structure, joist & deck, interior finishes, mechanical & electrical.

$4,000,000

BELTWAY OFFICE / WAREHOUSE COMPLEX

WEST JORDAN, UT 8/1/2017

Two 10,000 square foot office/warehouse buildings. The project includes; all site work, concrete, masonry, structural steel, joist & deck, roofing, overhead doors storefront, some interior finishes, mechanical, and electrical.

$2,000,000

IMG_0059.JPG
UDOT.jpg

UDOT MAINTENACE COMPLEX

MORGAN, UT 5/1/2017

New 14,000 square foot maintenance facility. The project includes; site utilities, asphalt paving, concrete, masonry, structural steel, roofing, overhead doors, all interior finishes, fire sprinklers, mechanical and electrical.

$3,500,000

UPS DISTRIBUTION FACILITY

UT 8/19/2016

New 22,000 square foot addition to an existing warehouse facility.

$2,000,000

245-1.png
232-1.png

PUBLIC WORKS ADDITION

SPANISH FORK, UT 5/31/2016

New building addition to existing Spanish Fork Public Works facility. The project includes; metal building, interior finishes, and site work.

$1,200,000

UTA FUEL & FARE BUILDING

SALT LAKE CITY, UT 9/15/2015

11,000 square foot CMU building using 12" insulated block. The project also included 2 acres of concrete paving, steel structure, CNG fueling equipment, vehicle service equipment, and an emergency generator system.

$6,156,000

246-1.png
247-1.png

VANGUARD ACADEMY

WEST VALLEY, UT 8/31/2015

42,000 square foot interior tenant finish for a 7th through a 12th-grade charter school. The project included complete interior demolition and all interior finishes, mechanical and electrical.

$1,200,000

UDOT KAMAS MAINTENANCE FACILITY

KAMAS, UT 8/15/2015

New salt storage building, wash & sander racks, site utilities, site concrete.

$1,250,000

KAMAS UDOT.png
hangars at skypark.png

HANGARS AT SKYPARK AIRPORT

NORTH SALT LAKE, UT 6/1/2015

15,000 square foot pre-engineered metal building aircraft hangar, subdivided into 5 individual plane storage units. The project includes; storm drains, water lines, asphalt, concrete, building, and electrical.

$500,000

MAGNA WWTP ADMINISTRATION BUILDING

MAGNA, UT 8/1/2013

3,500 square foot wood frame structure with rock and stucco exterior housing Water District offices. The project also includes asphalt parking, site work, and landscaping.

$774,000

magna wwtp admin.png
Blackridge Reservior.jpg

BLACKRIDGE RESERVOIR PARK

HERRIMAN, UT 5/1/2013

10-acre city park incorporating a secondary water storage reservoir into a recreational park with restrooms, concession building, playground, and landscaping.

$1,000,000

SORENSON UNITY CENTER

SALT LAKE CITY, UT 12/1/2007

This is a 36,000 square foot LEED platinum certified, a multi-purpose facility serving residents of Salt Lake County. This masonry and steel frame structure includes athletic, training, and exercise facilities, drop-in child care, donated dental services, training, and educational classrooms, offices, art and gallery spaces

$4,694,996

sorensonunitycenter.jpg
DavisDMV.jpg

DAVIS COUNTY DMV BUILDING

FARMINGTON, UT 6/30/2007

This 5,300 Square Foot Building is built with Metal Framing and Decking. It also features ICF walls.

$1,423,000

GRANTSVILLE FIRE STATION

GRANTSVILLE, UT 3/20/2007

New 15,000 SF Fire Station. CMU, Steel Framed with substantial site work and a Bell Tower.

$2,255,000

Grantsvillefirestation.jpg
DraperOfficeWarehouse.jpg

DRAPER OFFICE/WAREHOUSE BUILDINGS

DRAPER, UT 4/1/2007

Four 14,400 SF CMU Buildings with Site work

$2,640,000

STAPLES #1408

ROCK SPRINGS, WY 10/28/2006

28,000 square foot tenant interior finish in an existing shopping mall.

$569,000

staples.jpg
first national.jpg

FIRST NATIONAL BANK, DRAPER BRANCH

DRAPER, UT 6/1/2005

This Three Story Building is approximately 6,000 SF with finished office space. Interior woodwork throughout. Granite at tellar lines with solid surface work area. Natural Stone Tile and exterior. Wood Framing, EIFS, and Standing Seam Metal Roof.

$1,265,000

CHANNING HALL ACADEMY

DRAPER, UT 9/30/2006

A Charter School in Draper, Utah. 43,494 Square Feet Wood Framed Structure. Masonry wall Auditorium. Site work includes a Soccer Field and Playground.

$3,800,000

Channing School.jpg
springlakehousing.jpg

SPRING LAKE HOUSING DEVELOPMENT

SPRING LAKE, UT 4/1/2004

Immigrant Housing development. Multi-Family for Utah County Housing Authority.

$2,200,000

OSSINE' SHOES

WEST JORDAN, UT 10/1/2003

4,000 square foot masonry retail building with all interior finishes and minor site work.

$767,000

OSSINE'.jpg
WesternGarden5.JPG

WESTERN GARDEN CENTER

WEST VALLEY CITY, UT 9/1/2001

New greenhouse and retail center with associated site development.

$1,575,000

WEST JORDAN SENIOR CENTER

WEST JORDAN, UT 8/31/2001

Project Manager Walter Newman and Superintendent Joe Everill Have completed West Jordan Senior Center The project was finished ahead of schedule. The Senior Center has been a successful project for Brubaker Construction Inc. and all parties involved.  Our appreciation to Jensen Haslem, the architects that designed the building.

$2,235,000

west jordan senior center.jpg
cottonwood pool.jpg

BIG COTTONWOOD SWIMMING POOL

HOLLADAY, UT 1/1/2001

With a radius wall that sheaths the façade of the indoor pool and tight window lines wrapping around the perimeter of the building, this structure is fantastically aesthetic. The state-of-the-art pool was designed to minimize the risk of infants wandering from busy parents, as there is no direct drop-off on the shallow end. With six curved water slides, weight, and training rooms, along with one of a kind baseball diamond, this facility is a fantastic addition to the already special Brubaker Portfolio.

$4,864,000

bottom of page