COMPLETED

PROJECTS

BELTWAY OFFICE / WAREHOUSE COMPLEX

WEST JORDAN, UT 8/1/2017

$2,000,000

Two 10,000 square foot office / warehouse buildings. Project includes; all site work, concrete, masonry, structural steel, joist & deck, roofing, overhead doors storefront, some interior finishes, mechanical, electrical.

UDOT MAINTENACE COMPLEX

MORGAN, UT 5/1/2017

$3,500,000

New 14,000 square foot maintenance facility. Project includes; site utilities, asphalt paving, concrete, masonry, structural steel, roofing, overhead doors, all interior finishes, fire sprinklers, mechanical and electrical.

UPS DISTRIBUTION FACILITY

UT 8/19/2016

$2,000,000

New 22,000 square foot addition to existing warehouse facility

PUBLIC WORKS ADDITION

SPANISH FORK, UT 5/31/2016

$1,200,000

New building addition to existing Spanish Fork Public Works facility. Project includes; metal building, interior finishes and site work.

UTA FUEL & FARE BUILDING

SALT LAKE CITY, UT 9/15/2015

$6,156,000

11,000 square foot CMU building using 12" insulated block. The project also included 2 acres of concrete paving, steel structure, CNG fueling equipment, vehicle service equipment, and emergency generator system.

VANGUARD ACADEMY

WEST VALLEY, UT 8/31/2015

$1,200,000

42,000 square foot interior tenant finish for a 7th through 12th grade charter school. The project included a complete interior demolition and all interior finishes, mechanical and electrical.

UDOT KAMAS MAINTENANCE FACILITY

KAMAS, UT 8/15/2015

$1,250,000

New salt storage building, wash & sander racks, site utilities, site concrete.

HANGARS AT SKYPARK AIRPORT

NORTH SALT LAKE, UT 6/1/2015

$500,000

15,000 square foot pre-engineered metal building aircraft hangar, subdivided into 5 individual plane storage units. Project includes; storm drain, water lines, asphalt, concrete, building and electrical.

MAGNA WWTP ADMINISTRATION BUILDING

MAGNA, UT 8/1/2013

$774,000

3,500 square foot wood frame structure with rock and stucco exterior housing Water District offices. Project also includes asphalt parking, site work and landscaping.

BLACKRIDGE RESERVOIR PARK

HERRIMAN, UT 5/1/2013

$1,000,000

10 acre city park incorporating a secondary water storage reservoir into a recreational park with restrooms, concession building, playground and landscaping.

SORENSON UNITY CENTER

SALT LAKE CITY, UT 12/1/2007

$4,694,996

This is a 36,000 square foot LEED platinum certified, multi-purpose facility serving residents of Salt Lake County. This masonry and steel frame structure includes athletic, training and exercise facilities, drop in child care, donated dental services, training and educational class rooms, offices, art and gallery spaces

DAVIS COUNTY DMV BUILDING

FARMINGTON, UT 6/30/2007

$1,423,000

This 5,300 Square Foot Building is built with Metal Framing and Decking. It also features ICF walls.

GRANTSVILLE FIRE STATION

GRANTSVILLE, UT 3/20/2007

$2,255,000

New 15,000 SF Fire Station. CMU, Steel Framed with substantial site work and a Bell Tower.

DRAPER OFFICE/WAREHOUSE BUILDINGS

DRAPER, UT 4/1/2007

$2,640,000

Four 14,400 SF CMU Buildings with Site work

STAPLES #1408

ROCK SPRINGS, WY 10/28/2006

$569,000

28,000 square foot tenant interior finish in an existing shopping mall.

FIRST NATIONAL BANK, DRAPER BRANCH

DRAPER, UT 6/1/2005

$1,265,000

This Three Story Building is approximately 6,000 SF with finished office space. Interior woodwork throughout. Granite at tellar lines with solid surface work area. Natural Stone Tile and exterior. Wood Framing, EIFS and Standing Seam Metal Roof.

CHANNING HALL ACADEMY

DRAPER, UT 9/30/2006

$3,800,000

A Charter School in Draper, Utah. 43,494 Square Feet Wood Framed Structure. Masonry wall Auditorium. Site work includes a Soccer Field and Playground.

SPRING LAKE HOUSING DEVELOPMENT

SPRING LAKE, UT 4/1/2004

$2,200,000

Immigrant Housing development. Multi-Family for Utah County Housing Authority.

OSSINE' SHOES

WEST JORDAN, UT 10/1/2003

$767,000

4,000 square foot masonry retail building with all interior finishes and minor site work.

WESTERN GARDEN CENTER

WEST VALLEY CITY, UT 9/1/2001

$1,575,000

New greenhouse and retail center with associated site development.

WEST JORDAN SENIOR CENTER

WEST JORDAN, UT 8/31/2001

$2,235,000

Project Manager Walter Newman and Superintendent Joe Everill Have completed West Jordan Senior Center The project was finished ahead of schedule. The Senior Center has been a successful project for Brubaker Construction Inc. and all parties involved.  Our appreciation to Jensen Haslem, the Architects that designed the building.

BIG COTTONWOOD SWIMMING POOL

HOLLADAY, UT 1/1/2001

$4,864,000

With a radius wall that sheaths the façade of the indoor pool and tight window lines wrapping around the perimeter of the building, this structure is fantastically aesthetic. The state of the art pool was designed to minimize the risk to infants wandering from busy parents, as there is no direct drop off on the shallow end. With a six curved water slide, weight and training rooms, along with the a one of a kind baseball diamond, this facility is a fantastic addition to the already special Brubaker Portfolio.